When dental chair metal parts have similar weld locations and repetitive operations, a cobot may be worth evaluating. Productivity depends on more than welding speed: loading, locating, clamping and unloading also matter.
For a factory new to automated welding, understanding these steps is more useful than deciding how many robots to buy first.
Can one robot serve several stations?
A multi-station layout can be assessed against part dimensions and available space. A station is a position where a part is held and processed. One arm normally visits different stations in sequence; it does not weld several parts simultaneously.
The aim is to reduce waiting by coordinating preparation and welding within a properly engineered safety arrangement. Savings depend on welding, clamping, unloading and robot travel times.
Six stations do not mean six times the output. Longer travel or slow clamping can limit the benefit of adding stations.
Which parts should you assess first?
Start with three checks. Frequent model changes can still be evaluated, but include fixture changes, program switching and first-part inspection in the time calculation.
- Repetition: is the same model produced regularly, with reasonably consistent weld locations and joint types?
- Fixturing: can parts be located and clamped conveniently, without moving or distorting during welding?
- Torch access: arm reach alone does not guarantee the correct torch angle. Check fixtures, part edges and cables together.
Must you replace an existing welder?
Check its exact model and control interfaces. The robot moves the torch; the power source supplies the weld output. Arc start, arc end and status signals must work together. Reuse should follow a compatibility assessment.
Published application reference
DOBOT published an application at PeyMar, a dental chair manufacturer in Mexico. With DOBOT and Grupo HITEC, the company used one CR20A for MIG welding across six stations.
View the original case and resources
This is a layout reference, not a performance guarantee. The published text gives no complete cycle-time or before-and-after output figures to apply to another factory.
A WeldVanta application guide. Referenced third-party projects were not delivered by WeldVanta. Configuration and results require assessment of the actual workpiece.